Projects

Event list in the project

Create, edit and filter many project events in a table and connect them with the calendar and timelines

The event list (also called schedule) is designed for projects with many events: rehearsals, setup, performances, guest appearances and strike can be maintained in a table more quickly than through many separate calendar dialogs. Every row is a real calendar event. Changes therefore appear immediately in the main calendar and may affect the project period and shift planning.

Depending on your configuration, the tab may be called Event list, Schedule or use a custom name. It must be set up as a component of the project view and always runs across the full width there.

Event list, project calendar or main calendar?

ViewUse it when …
Event listYou want to enter or change many events of the same project quickly.
Project calendarYou only need this project, but in the familiar room/day view.
Main calendarYou need to assess occupancy and conflicts with other projects and free rooms.

Reading the table

Each row represents one event. Depending on the configuration and the width of the view, it includes among other things:

  • event type, event name and room,
  • start date, optionally end date,
  • start time and end time; for all-day events both fields stay empty,
  • a repeat icon in front of the start time if the event belongs to a series,
  • the description, via the note icon or shown below the row,
  • Copy and an action menu for editing or deleting.

The event list does not show event properties; you find them in the event form.

The columns fill the full width of the tab; a configured column width acts as a minimum width. The column header row stays visible while scrolling in both directions. Descriptions can be shown or hidden so that either as many events as possible or more content details are visible.

Recently edited and newly created events are marked by a subtle tint of the row. The marker switches immediately on saving, even if only the description was changed. A coloured bar at the start of a row marks a planned event; the legend directly below the column header explains all three markers.

Function bar

A function bar sits above the table. Its settings apply to your account:

IconEffect
Multi-EditShows selection boxes, see Editing existing events
Show event descriptions directly in the listShows the description below each row and makes it editable there
Move the end date along when the start date is changedWhen the start date changes, moves the end date by the same span so that the duration is kept. If the switch is off, the end date stays; if it would lie before the new start, it is set to the start day
Switch for planned eventsDecides whether new rows are created as fixed or as planned events
FilterOpens the filter panel, see Filtering
Customize column sizeSets the minimum width per column; Reset to default restores the default
Export project listOpens the export of the event list
Show project period in calendarSwitches to the calendar with the project period
SortingSort by room, Sort by appointment type, Sort by day or Reset sorting; the rows are grouped accordingly

The columns Event Status and Admission only appear if the respective feature is switched on for the whole house: the event status at the top of the Event statuses page of the event settings, admission under Standard values. Multi-edit, the end date switch, the switch for planned events and the plus icons for creating events only appear if you may edit the component and create events.

Filtering

The event list uses the same filter as your calendar: what you set here also applies in the calendar, and a filter set there hides events here as well. If events are missing from the list, check the filter first. In the event list the filters by rooms, areas, room categories, room attributes, event types and project status take effect; other calendar filters, such as by event properties, have no effect here. Filter combinations can be stored as saved filters; the active saved filter is highlighted in green with a check mark, the Deselect filter icon switches it off, the X deletes it.

Creating individual events

Add a new row. The plus icon below the list or below a group immediately creates an event in the open project. It takes over room, event type, name and times of the last row of the group and lies one day later; with Sort by day, on the same day.

Check room and event type. Required fields depend on the event type configuration.

Enter date and time. Without a time, the event is all-day. For multi-day events, show the end date column with the switch next to Start date.

Add name and description. The description is also visible in the calendar and in the regular event form.

There is no save button in the event list: every change in a row is saved immediately and appears in the calendar.

Events crossing midnight

If the end time is earlier than, or identical to, the start time, Artwork can place the end on the following day. Always verify the displayed end date for night shifts and multi-day bookings.

Creating several events together

For similar events, such as a run of performances or several rehearsal days, use Copy in the row: enter the Count, choose the interval (Daily, Weekly, Monthly or on the same day; shown in the language of the interface Coming with the next update) and confirm with the check mark. The copies take over room, event type, name, times and description and are created immediately.

Right after creating a project, the same table can open as the Events window. There you only prepare rows at first; Create then creates all events together.

Afterwards, or before creating, check:

  • Are room and event type correct in every row?
  • Are individual names really required, or is the event type enough?
  • Are times and end dates in the correct calendar day?
  • Should all events be relevant for the project period?

Editing existing events

Many values can be changed directly in the row. For more extensive details, the action menu opens the single editor in the event form. For series events you choose there at the top whether the change applies to Only this event, This and following or the Whole series — see Editing series.

With the Multi-Edit switch you select several rows. A bar appears at the bottom with the number of selected events and three actions:

  • Edit opens a dialog for event status, event type, room, event name, day, start and end time. Select fields left at No change and values that are not filled in remain unchanged.
  • Convert to planned events turns the fixed events of the selection into planned events; open room requests are withdrawn in the process. The button is shown to people with the permission Edit planned events and to admins.
  • Delete removes the selected events after a confirmation.

For series events, the action menu of the row additionally contains Edit all series events and Delete all series events for admins.

Edit series deliberately

A change with Only this event creates a deviating event. Use This and following or Whole series if the new value should apply to the run. Deleted events go to the trash; before a bulk deletion, check whether the series also includes events outside the currently visible period.

Event timeline

A timeline describes the internal sequence of an event, such as get-in, soundcheck, doors, performance and strike. The event list does not show it or edit it row by row; that happens on the event, see Timeline. The action menu of a row offers two shortcuts:

  • Import timeline preset brings a preset into the event.
  • Save timeline as preset stores the existing timeline of the event as a new preset. The entry appears for people with the permission Plan events directly and for admins, and only has an effect if the event already has a timeline.

The timeline is part of the event but not an additional room booking. If a section needs its own room or its own approval process, create a separate event or sub-event for it.

Switching to the calendar

If the list is set to Sort by day, a click on the day heading of a group opens the corresponding day in the main calendar; with the Ctrl or Cmd key held down, in a new tab. Use this to check adjacent rooms, parallel productions and booking conflicts. The option Show project period in calendar uses the project's calculated period as the visible range.

Effects on project and shifts

Events with a type configured as relevant for the project period automatically move the start or end of the project. The shifts tab shows all events of the project. If an event is moved or deleted, therefore also check planned shifts and timelines.

Typical final check

  1. Sort the event list by date.
  2. Complete events without room or event type.
  3. Check overnight and multi-day events.
  4. Verify the project period.
  5. Review conflicts and adjacent rooms in the main calendar.
  6. Then open the project's shift planning.