Exports & Calendar Subscription
Take the calendar outside — as PDF (calendar, monthly overview, season schedule), Excel or an ICS subscription
Export dialog
The Export calendar button in the function bar opens the export dialog with five tabs. The visible calendar range and the active filters are preselected in every tab and can be adjusted there independently; the dialog closes after the export. The two Excel tabs open in the mode Export by project; you only see the preset time range there after switching to Export by period:
| Export | Contents |
|---|---|
| PDF Monthly Overview Calendar Export | A compact month display; the first tab. |
| Season schedule projects (PDF) | Year or season overview in wall-calendar style with project names per day — see below. |
| PDF Calendar Export | The grid as a PDF: the classic occupancy plan for posting up. |
| Excel Event List Export | The events of a time range or of selected projects as a table with selectable columns, ideal for further processing. |
| Excel Calendar Export | The calendar grid as a table. |
Check period, project mode and active filters before exporting because they define the content. Depending on the PDF variant, you can choose heading, paper size, orientation and resolution (DPI), among other things. The event list is better for sorting and further processing; the calendar grid keeps the relationship between days and rooms. The PDF is downloaded right after it has been created; Artwork keeps no copy for later retrieval. For a new state, export again.
Options of the PDF tabs
PDF Calendar Export and PDF Monthly Overview Calendar Export share these fields:
| Option | Effect |
|---|---|
| Heading | Title above the plan. |
| Project (optional) | With a project, the PDF Calendar Export uses the project period; the monthly overview determines the months of the project and creates one page per month. |
| Period | Without a project: Start date and End date in the PDF Calendar Export. In the monthly overview Day of start month and Day of end month; the whole month of the selected day is always exported. |
| Paper size | A4, A3, A5 or A6. Preselected: A4 in the PDF Calendar Export, A3 in the monthly overview. A6 is only possible in landscape format. |
| Paper orientation | Landscape format or portrait format. Preselected: portrait format in the PDF Calendar Export, landscape format in the monthly overview. |
| Resolution (DPI) | Standard 72, maximum 300. |
Only the PDF Calendar Export additionally offers Days per page (default 7) and the Export mode: Events relative to each other shows concurrent events side by side and makes overlaps visible, Events in time blocks lists them one after another per time block and is easier to read.
Options of the Excel tabs
Both Excel tabs have the toggle Export by project / Export by period at the top:
- Export by project: search for one or more projects or pick them from the recently opened ones. All events of these projects are exported; the calendar export spans from the earliest to the latest of these events. Without a project the Export button stays disabled.
- Export by period: Start date and End date. All events that touch the period are included, also those that start before the period and only end after it Coming with the next update. Events without an end time are included if they start within the period.
Under Filter you narrow down by rooms, areas, room categories, room attributes, event types, event properties and project status in both modes.
Only the event list has the Columns section. All columns are preselected and can be deselected individually: Event ID, Project name, Start date, End date, Start time, End time, Event type, Event name, Event description, Event Status, Room, Project team and Project properties (categories, genres and sectors of the project). Admission is only offered when the admission field is activated, Artists only when the artists field for projects is switched on. Without the event status module the Event Status column stays empty.
Planned events in the event list
The event list has no display settings. Anyone who may see the planning calendar also gets planned events exported there. In the event status column they carry the addition planned Coming with the next update, for example "Option (planned)", or just "planned" without an event status. If you only need fixed events, filter by this column or use the Excel Calendar Export with Show planned events switched off.
Filter presets
In the three PDF tabs you can save the selected room, area and event filters as a personal preset: above Active filters there is Save current filters as preset (only when at least one filter is active); in the Save filter preset dialog you enter a name. Saved presets appear as chips under Saved filter presets and apply in all three PDF tabs. A click resets the filters and activates the preset; the X deletes it after confirmation. Period, project mode and display settings are not part of the preset. The Excel tabs have no presets; for the calendar view itself there are the saved filters.
Display settings in the export
Every tab except Excel Event List Export contains a Display settings panel, preset from your current calendar display settings. Changes only apply to this export; your calendar view stays unchanged:
- Event color — Color by event type, by event status or by main category of project
- Event content — Event name, Description, Project Status, Project managers, Artists, Event creator, Admission, Event status spelled out
- Artist names instead of event title — artist names replace the event name; events without artists still show the event name
- Visibility — Hide unoccupied rooms, Show planned events, and for the PDF calendar additionally Day remarks
The season schedule uses only the color source and the artist names from this panel, because it contains no event tiles.
Season schedule projects (PDF)
The Season schedule projects export is a year or season overview in the style of a wall calendar: months as columns, days 1–31 as rows, and per day the names of the projects that have events there. Times and event details are deliberately left out; if a project has several matching events on one day, the count follows the name ("Project name (3)"). Multi-day events count on every day of their duration; events from the planning calendar are not included.
- Period — start and end date; up to 6 months are displayed per page, longer periods run over several pages. The export is always in landscape format.
- Only show days with event type — if the event type filter is set, a project only appears on days on which it has at least one event of the selected event types. Without a selection, all events count.
- Active filters — rooms, areas, room categories and attributes and event properties as in the calendar; saved filter presets can be applied here and new ones created via Save current filters as preset.
- Display options — Show holidays (name and marker from the holidays), Show calendar weeks, Highlight weekends, Highlight project names in color (color according to the selected color source), Show events without project (then the event name is shown), Show room abbreviations (after the project name), Half months per page (double row height)
- Characters always shown in full (default 16) — the font size in a cell grows as far as row height and column width allow, but at most until this many characters of a name fit without truncation. A smaller value gives larger text and more truncated names, a larger value smaller text and longer readable names.
- Heading, Paper size (A3 as the default, or A4) and Resolution (DPI).
If Show calendar weeks is unticked, the calendar week column is dropped; weekday and day number then share one column ("Mo 1") and the content column per month becomes correspondingly wider. With High contrast active in the display settings, text on color-highlighted project names switches to white only on dark colors.
Calendar subscription
The Subscribe to calendar button sets up a personal ICS feed that phone and desktop calendars can subscribe to — so the schedule lands in your private calendar automatically:
- Can be restricted to a time range, event types, areas and rooms.
- Activate calendar notifications Coming with the next update with a lead time (minutes, hours or days) adds a reminder to every event in the feed, just like the roster subscription. The reminder text is in your language, for example "Rehearsal starts in one hour."
- Alternatively, an ICS file can be downloaded (a one-off snapshot instead of a subscription).
- Planned events from the planning calendar are never part of the feed because they are not confirmed yet.
The feed contains all fixed events of the house that match your selection, not only your own. This includes events whose room request is still open. Events without a room appear as cancelled. Without a defined time range the feed reaches indefinitely into the past and the future. Each entry carries the event name (or else the project name), room and project as the location, the description with the name of the person who created the event, and a link to the project.
A subscription refreshes regularly in the calendar application, while a downloaded file does not. If an event changes in Artwork, the change therefore appears automatically only in the subscribed feed. You adjust period and filters of the feed later via the same Subscribe to calendar button; the subscription link stays the same.
Keep your subscription URL private
The feed address is meant for the signed-in person. Treat it like a personal access key, as calendar applications retrieve the feed via this link. If the link has been shared unintentionally, Renew link in the subscription instructions creates a new address. The old link becomes invalid immediately; afterwards, subscribe to the calendar in your calendar application with the new link. For deactivated accounts the feed no longer delivers data.
There is a separate subscription for your personal roster — see Exports & calendar subscription in the duty roster.
Last updated on