Shift Plan

Creating Shifts

The shift dialog, function slots, breaks according to the Working Hours Act and templates

Shifts are created directly in the duty roster (requires the Plan shifts permission). Hover over a room/day cell and two icons appear at the bottom right: Add Shift based on templates (creates shifts from templates or template groups in this cell) and Add Shift (plus). The plus opens the shift dialog.

The same dialog is used for editing — clicking any shift card opens it as Edit shift.

Before creating new shifts, decide whether they belong to an existing event or should stand alone. Event shifts inherit the date and context of the event; standalone shifts are more flexible for duties without a calendar entry.

The shift dialog

The dialog is a single card without scrolling, ordered from top to bottom the way you plan a shift:

Template quick select (optional)

At the very top is the collapsed row shift templates: a template fills the whole dialog with saved values (times, break, craft, functions). The list is searchable. The Time presets sit further down, next to the time fields.

Choose the craft

The craft determines who can be assigned and which function slots the shift offers — which is why it comes before all other fields. Changing the craft of an existing shift removes all people already assigned; the dialog points this out.

Times and break

  • Start time / End time with date: the working time. A shift longer than 10 hours triggers a warning. For shifts attached to an event, the dialog also warns if the shift starts before the event or only after it has ended. Both are hints; you can still save.
  • Length of break in minutes: the unpaid break. The field is required; enter 0 for a shift without a break. See Breaks according to the Working Hours Act.
  • Time presets: the collapsed row below the time fields applies a saved start/end time and break length with one click (managed in Shift Settings).

Room

Prefilled from the cell you clicked; standalone shifts keep the room so they appear in the grid. The room is required: a standalone shift cannot be saved without one.

Define the demand

After choosing the craft, the functions of the craft appear first, each with a counter (e.g. Mitarbeiter: 2, Meister: 1), followed by the global qualifications — cross-craft attributes such as first aider or forklift licence that are requested in addition to the functions. These numbers are the shift's demand: they define the slots, drive the occupancy display (1/3) and later the reminders about shifts that are not fully staffed.

Project, shift group and note

  • Project: link the shift to a project so it appears on the project's shifts tab and in project-based views. Tiles of the recently opened projects speed up the selection; if the shift lies outside the project period, the dialog says so. A project change is visible in the duty roster immediately.
  • Shift group: optionally group related shifts (groups are managed in the shift settings and can be shown as tags in the grid).
  • Note for this shift (optional): a free-text description shown in the grid when Show description is enabled.

Save

Save creates the shift; it appears immediately as a card in the corresponding cell. Required fields are craft, room, start and end time and the break. If something is missing, the save button is disabled and names the missing fields next to it ("Missing: …"). Server errors are shown in the dialog. In the edit view, the red button Delete shift deletes the shift.

If the shift is already committed, the bottom of the dialog shows the note This shift is already committed. with the button Canceling a fixed term, which lifts the commitment (permission Commit duty rosters).

Later changes to time, craft, demand, description or staffing are recorded in the shift history. If the shift is already committed, they additionally appear in the change list.

The shift history of this shift opens via the Shift history button at the top right as an embedded window; clicking beside it closes only the history, not the dialog. The explanatory box on how a shift is built lives in the help panel of the duty roster.

Breaks according to the Working Hours Act

In all break fields — shift, individual time, series, shift templates and time presets — Artwork fills an empty break automatically with the legal minimum: 30 minutes for more than 6 hours, 45 minutes for more than 9 hours of working time. Below the field you see whether the value is automatic or manual:

  • Break automatically filled according to the Working Hours Act (30 min) — the value follows the entered time.
  • Manual (20 min, legally 30 min) — you entered a value yourself. Manual values are never silently overwritten; a reset button restores the legal minimum. If the value is below the minimum, the hint appears in a warning colour.

The thresholds are strict: at exactly 6 hours no break is required, at exactly 9 hours 30 minutes are enough. For shifts across midnight, artwork calculates up to the end on the following day. As long as you have not changed the break yourself, it follows the times in both directions: if you shorten the shift, the automatically set break goes down as well.

The protection of manual values applies to what you type in the open window. A value below the minimum that does not come from input in this window is raised to the minimum instead. This affects the break from a shift template or time preset, and also a saved shift with a shorter break that you open again for editing. If the shorter break should stay, enter it once more before saving. A break below the minimum does not prevent saving.

Where shifts can be created

Besides the plus icon on a cell, shifts can be created:

  • On an event: from the event in the calendar or the project's shifts tab. Event shifts appear inside the event's card in the duty roster and inherit its date.
  • In bulk: with the Edit (pencil) switch in the function bar, select several room/day cells and add the same shift to all of them at once (also with a shift template from the template quick select). The same mode deletes in bulk.
  • In the daily view: every room section has its own "Add appointment" / "Add shift" buttons.
  • On a series event: shifts on a recurring event count as repeat shifts. When you drag a person onto such a shift, the window Shift staffing period asks whether the assignment applies For this day only or On this and other days (with period and weekday). On this and other days with Every day is preselected. Artwork then assigns the person to the corresponding shifts of the series in the chosen period. Shifts in which the function is missing or already fully staffed are skipped.

Planning many shifts with templates

You create several shifts at once with the icon Add Shift based on templates that appears when you hover over a room/day cell. It opens the window Add Shifts by Presets and Groups for exactly this room and day. In the tabs Groups and Single presets you select what should be created. Groups and single templates can be combined; templates selected twice are created only once. The selection previews times, crafts and function demand of the templates; optionally a project can be assigned. This suits recurring weekly plans and standard event days.

Add shifts creates the shifts immediately, without opening the shift dialog: as standalone, uncommitted shifts in this room, with times, break, craft, description and function demand of the template. If a template's end time is not after its start time, the shift ends on the following day. A template without any functions gets one slot of the function Mitarbeiter, provided an available function with this name exists. Templates without valid times or without a craft are skipped. You make adjustments on the individual shift afterwards.

Only templates of crafts you are allowed to plan are offered. A template group only appears if this holds for all of its templates; if a group is missing from the selection, this is usually the reason. You reach the same window in the daily view via the icon next to Add Shift.

In multi-edit mode (pencil in the function bar), select the room/day cells first and then click Create. The shift dialog opens; the shift you enter there is created in every selected cell. Via the template quick select you can apply a single shift template. Template groups are not available in multi-edit mode.

Existing shifts are duplicated in the list view: select several shifts via multi-select there and click Duplicate. Review rooms and times after copying.

Shift templates

In the shift settings (tabs Shift templates and Template groups) you manage reusable shift definitions — each with times, break, craft, description and function demand. Templates can be bundled into template groups so a standard day of a certain production type is applied in one action. Timeline presets, reusable production schedules (get-in, soundcheck, doors, show …) that can be imported into an event, are not part of the shift settings. You find them in the event settings.

Templates, time presets and shift groups are administered in Shift Settings — the shift dialog only consumes them.

Shifts without a room or event

A standalone shift needs neither an event nor a project, but always a room: the Room field is required in the shift dialog ("A room is required."). For duties without an event room, such as office hours or standby, pick a suitable room of your house. The room must carry the property Relevant for disposition, otherwise it does not appear in the duty roster (see Rooms, areas & booking access). The project stays optional. Filters and project mode determine the context in which the shift is shown.

Working time without any room is not modelled as a shift but as an individual time. A day service only marks a person's day; it has no times of day and does not count as working time.