Sources of Funding

Projects & budgets

Permit projects, assign positions, and understand the funding evaluation

A funding source and a project budget are connected in two stages. First, permit the project on the source. Then assign the appropriate budget positions in that project to the source.

Permit projects for a source

Open the source and expand Funded projects in the side panel. Use the edit button to search for projects or choose from recently used projects. Remove a project from the selection when it should no longer be linked, then save the list. The edit button is only shown to people listed on the source under Responsible or Write access, and to admins.

Permitting a project does not change any amount by itself. It determines which projects may select this funding source later in their budgets. This helps prevent the fund from being used in unrelated projects by mistake.

Assign budget positions

Next, open the budget of the permitted project. Assign the relevant cost or income positions to the funding source. The exact budget view and column depend on your organisation's budget structure.

Add the project under Funded projects on the funding source.
Open the project and navigate to the appropriate budget tab.
In the row, open the Cell Details via the plus icon of the value cell and switch to the Linking tab.
Enable Link to funding source, search for the source and choose whether the value counts as Expenses or Revenue.
Save, return to the source and check the remaining amount and project total.

The search on the Linking tab only finds sources that list the current project under Funded projects. If the column is locked, the link cannot be changed.

Besides individual cells you can also link sums: the sum of a sub position, of a main position, or the overall sum of expenses or revenue. Open the Sum Details of the respective sum cell and switch to the Linking tab as well. For sums, the choice between Expenses and Revenue decides whether the value is deducted from the source or added to it.

One cell counts per row

If several cells of one budget row are linked to the same source, Artwork only counts one of them: the cell in the column marked Relevant for budget, otherwise the cell in the rightmost column. This prevents an amount from being counted twice when the plan and the actual column carry the same link.

See Project budget for more budget fundamentals.

Interpret the key figures

The detail page shows the original volume and the calculated still available amount. A bar also visualises the percentage used.

  • A cost position uses the source and reduces the available amount.
  • An income position is included positively.
  • A negative or exhausted remaining amount is highlighted in red. The amount is also red once a remaining-budget reminder has fired; Threshold reached is then shown next to it.
  • Consumed always lies between 0 and 100 percent, even if the source is overdrawn or income lifts the available amount above the initial volume.
  • On a funding group, positions from the member sources are combined.

Totals per project shows the balance for every linked project. The bars relate each project total to the initial volume: green for a positive balance, red for a negative one. Use the project filter to limit the position list to one project; Totals per project then shows only that project as well.

Review linked positions

Each position displays:

  • whether it is a cost or income,
  • its amount and entry date,
  • the associated project,
  • main and sub-position,
  • the budget column, where available.

The project name links directly to that project's budget tab. This is the best route for correcting an incorrect assignment or value at its source.

Why does the remaining amount differ from what I expected?

Check the following in order:

  1. Is the expected project listed under Funded projects?
  2. Is the specific budget position assigned to the correct source?
  3. Is the position recorded as a cost or income?
  4. Is the correct value in the relevant budget column?
  5. Is the project filter currently limiting the view to one project?
  6. Are you viewing a group while expecting figures for only one member source?

A project link without assigned positions does not use any money. Conversely, remove a source from a project only after its existing assignments have been resolved.

Correct the source or the project?

Change master data such as funding volume and period on the source. Correct costs, income, budget columns, and the funding assignment on the relevant budget position in the project.