Changelog
Update October 2026 (3)
Published in October 2026 as version 1.9.0.
Projects
- File upload with upload areas: The “Documents” component is now called “File upload”. Every tab or folder it is placed in is its own upload area with its own limits: allowed file types, maximum file size and maximum number of files per project – for external access as well. For each file you choose under “Visible in”, while uploading or later, which areas it appears in; a badge shows “Only here” or the other areas. “All documents” also shows where a file is visible.
- Roles in CRM contact lists: Contact lists in a project have the new setting “Use roles”. You create roles freely (with suggestions), group them and link CRM contacts to each role, optionally limited to certain contact types. The special role “Artist” replaces the previous automatic linking as project artist. The “Projects” tab of a CRM contact, the print layout and the project overview show list and role. ⚠️ Note for admins: Existing artist links are moved to the special role during the update.
- Linked artists shown everywhere: Calendar, shift plan, exports, print layout, project overview, BI, app, search and master data show the linked artists from the CRM in addition to the free text. In the calendar, the shift plan and the project overview, clicking a name opens the CRM info card. Artists entered by external persons only appear after the internal review.
- Multiple selection: New project component “Multiple selection (checkboxes)” with freely definable options. Dropdowns have the new setting “Allow multiple selection”; it can be switched off as long as no project has selected several values. Multiple values appear in the print layout, the project overview, the BI export and for external access. If an option is renamed or removed, the selection in the project can still be changed; the old entry is dropped on saving.
- Convert a project into a project group and vice versa: Under “Edit basic data”. A confirmation window explains the effects beforehand: if a project group becomes a project, the connection to its sub-projects is lost; the sub-projects themselves remain as separate projects.
- In the project overview, the “Project group” column now shows which group a project belongs to.
- Project groups can be created again when the project status is a required field; the status field now also appears in the project group form.
CRM
- New property type “Multiple selection”, either as checkboxes or as a dropdown. The contact list can filter by it (contacts with at least one of the selected options); in the import you separate several options with a semicolon. An existing selection box can be converted into a multiple selection; all existing values are kept.
Calendar and planning calendar
- Planned events are no longer room requests: They are always created as firmly planned and stay that way when edited from the regular calendar. Editing a firmly booked event no longer turns it into a room request either. ⚠️ Note for admins: “View planning calendar” now only allows viewing. Creating planned events requires “Plan directly in the planning calendar” (room admins in their rooms also without it) – even with “Events always bookable directly”. “Edit planned events” now only applies to planned events. The shift plan only shows planned events to people with a planning calendar permission. Existing planned events with request status become firmly planned events during the update.
- Separate display settings: Calendar and planning calendar each have their own display settings. ⚠️ Note for admins: After the update, the planning calendar settings start as a copy of the previous calendar settings.
- Bulk action “Convert to planned events” for several selected events – in the calendar (including the compact view) and in a project’s event list. Open room requests are withdrawn in the process.
- Reviews in the planning calendar:
- Inbox and “Requests sent by me” update live.
- “Open in calendar” leads to the planning calendar at the week of the event.
- Rejected events can be sent for review again.
- In review mode “all”, one rejection ends the round.
- A withdrawn request keeps earlier rounds as history.
- Designated reviewers see “Approve/reject review” in the planning calendar as well.
- If an event type has no reviewers, a message appears, and duplicate requests are no longer created.
- Room admins can request reviews for their own planned events via multiple selection too; skipped events are listed in one combined message.
- “Approve” and “Reject” in multiple selection only appear when the selection contains events you are allowed to review.
- Admins can approve planned events directly – individually in the event menu or together in multiple selection, even if no review has been requested yet or other reviewers have not agreed yet.
- Anyone allowed to approve an event type alone sees “Approve” instead of “Request review” for these events.
- The planning calendar shows event properties, sub-events and the timeline icon like the calendar. Events on the last day of the period are no longer missing, and after switching to project mode you stay in the planning calendar.
- After a requested event has been rejected, the planning calendar can be opened again.
- “Hide empty rooms” now depends on what a room actually shows with your filters and display settings; rooms that only show shifts as cards stay visible. If this or a filter leaves no room to show, a hint appears instead of an empty area.
- Holidays: Your own holidays determine the day colour before imported holidays. If several holidays with different colours fall on one day, the day is hatched. Shifts sit opaquely on top of the day colour, just like events.
- Calendar subscription: The subscription link for events can now be renewed as well; the old link stops working afterwards. Planned events no longer appear in the subscription.
- The event dialog now depends on the event itself, not on the calendar it was opened from: anyone allowed to edit an event sees “Save”.
- An event’s timeline icon now sits below the menu (⋮) and is no longer covered by the “+”.
- In the day view, a period of exactly 31 days no longer shows a limit warning.
Rooms
- Teams as room admins and request permissions: In room access you can now add whole teams; all team members receive the permissions and notifications. ⚠️ Note for admins: The members of teams that are room admins can only be changed by people allowed to edit rooms.
- New room page: Description, access, properties and documents are visible directly on the page and can be edited via the pencil icon.
Shift plan and personal schedule
- Own individual times: With the new permission “Enter own individual times” there is a plus per day in your own schedule to create an individual time for yourself – once or as a recurring series of up to two years. Your own times can be edited and deleted there too; past days remain reserved for people with “Manage availability of others” or “Plan shifts”. ⚠️ Note for admins: Creating, changing and deleting your own individual times now requires this permission or one of the management permissions mentioned.
- The calendar week in the date row now always matches the date selection and the shift plan release (previously shifted by one week in 2027, for example); the weekly hours in the week column therefore belong to the correct week.
- The list view shows the first week immediately and loads the remaining days in the background. Assigning, removing, individual times and day status work without reloading the page.
- “Hide empty rooms” also hides rooms whose shifts are all hidden by “Only show shifts that are not fully staffed”. The project status filter now also applies to events.
- When entering an absence or availability, “To” automatically jumps to the “From” date.
Users and sign-in
- Changing your own email address requires your current password; a notice is sent to the previous address.
- Signing in to the app is valid for 90 days and ends as soon as the password is changed or reset.
- When you switch the mail server in the mail settings, you enter the password again.
- Sign-in via identity provider: Connections have the new option “Trust email addresses from this identity provider”. Without it, artwork only creates new accounts if the identity provider reports the email address as verified. Existing connections have the option switched on. ⚠️ Note for admins: Microsoft connections need their own tenant ID; “common”, “organizations” and “consumers” are no longer accepted. Sign-in via such a connection only works again once the tenant ID has been entered.
- LDAP: The allowed email domains now also apply to synchronisation. People deleted in artwork are not recreated by synchronisation or sign-in; anyone who should regain access is invited again.
Interfaces
- Sage interface: When you change the host, you enter the password again. ⚠️ Note for admins: Only https addresses are accepted as host. An existing http connection keeps working, but requires an https address the next time the settings are saved.
Other
- Installed version: Under System → Tool settings you can see which artwork version is installed. A link leads to the matching changelog entry; if a newer version is listed there, it has not been installed for you yet.
- The “Settings for this type” link in notifications is always visible, not only when hovering with the mouse.
- After restoring a budget template or an article from the trash and after approving a working time request, the page no longer jumps to the top.
- Read receipts in the chat show the time immediately in the usual format.
- Shift plan, calendar, project overview and inventory should now load noticeably faster.
Something wrong or missing on this page? Let us know.