Figures & data quality
Interpret KPI tiles, estimates, warnings and quick entry correctly
The KPI tiles summarise the selected period across all productions. Where appropriate, a green or red percentage shows the change from the selected comparison period, by default the previous year. If no comparison is shown, the comparison value may be zero or unavailable. Values that have not been recorded are shown as —, not 0. An info tooltip on every tile explains how the figure is calculated; a legend below the production table describes the colour logic: occupancy green from 90 %, blue from 50 %, yellow below; attainment green from 100 %, yellow from 80 %, red below; costs green up to plan, yellow up to 120 % of plan, red above. If plan values are recorded in the projects, the tiles additionally state the plan value and the attainment.
Meaning of the figures
| Figure | Calculation and meaning |
|---|---|
| Visitors | Total recorded attendance; missing values may be estimated from sold tickets |
| Revenue | Total revenue recorded in BI data |
| Costs | Sum of the recorded total costs. The tile only appears if at least one production has recorded costs, and only counts these productions |
| Occupancy rate | Sold tickets in relation to the seat capacity of the rooms played in the period |
| Event days | Number of days with events whose event type carries the BI tag "Event day" |
| Performances | Number of events whose event type carries the BI tag "Performance" |
| Productions | Number of regular projects with at least one event in the period, whether or not all BI figures are complete |
| Recorded | Productions in the period that have at least one BI figure (or are marked as not relevant); the others pull every total towards zero |
An ≈ before the visitor total means that at least one value was estimated from sold tickets. The estimate is useful for orientation but is not a substitute for confirmed attendance.
For visitors and revenue, figures recorded per event only count with the events in the period; figures recorded as a total count in full as soon as the production has an event in the period.
If productions in the period have broken down their tickets by audience category, a second row appears below the tiles: Tickets issued, Free tickets with Free ticket rate, Reduced tickets with Reduced ticket rate and Paying rate.
For occupancy, Artwork adds sold tickets and effective capacities across productions and calculates an overall ratio. It is not a simple average of the displayed project percentages.
Missing BI-tag warning
BI tags classify event types as performances or event days for reporting. Which tag controls which key figure is set in the tag dialog under System → Events → BI tags with Controls key figure: exactly one tag controls "Performances" (and thus the capacity basis of the occupancy rate), one controls "Event days". Renaming a tag does not change this.
If the controlling tag is not assigned to any event type, the dashboard displays a warning and shows Performances, Event days or the occupancy rate as — with a hint — even when calendar events exist. There is no fallback to all events.
Configure BI tags takes authorised users to the BI tags. Assign the appropriate event types there. This does not change the events themselves; it defines how they contribute to reporting.
Recognising data gaps
Artwork flags productions that have events in the selected period but no overall or per-event visitor, ticket or revenue figures. These gaps pull the overall evaluation towards zero and should be reviewed before reporting; the Recorded tile shows how many productions already have figures.
A production is not considered a gap if all three figures have deliberately been marked Not relevant. This distinction identifies whether information is missing or genuinely does not apply.
Quick entry
Click a project name in the data-gap warning. A click on a production in the production table, by contrast, opens the project's BI tab directly. Quick entry lets you record project totals for:
- visitors,
- sold tickets, and
- revenue,
or mark a figure Not relevant. Existing values are prefilled — you only change what is new. Artwork refreshes the dashboard after saving. Open project takes you to the project's complete BI view.
In quick entry you can only save for projects in which you have write access: with the global write permission for projects, as a team member with write access, as project management, as the creator, or through a department assigned to the project. The permission to view the BI dashboard is not enough; without write access the dialog reports an error when you save.
If the BI component is not included in any project tab, the dashboard shows a warning at the top with the link Open tab settings. As long as it is missing, BI figures cannot be maintained in the projects.
Quick entry stores project totals
It does not distribute figures among individual events. If a figure is already recorded per event in the project, totals do not apply here; quick entry points this out. Maintain event-specific visitor, ticket or revenue data in the project's BI tab in the Per event input mode.
Checks before evaluation
- Does the selected range match the reporting period?
- Are the controlling BI tags assigned to the relevant event types?
- Have all reported data gaps been resolved?
- Are estimated visitor figures sufficient for the intended purpose?
- Are room and project capacities current?
- Have non-applicable figures been explicitly marked?
You can also create a project snapshot to preserve a reporting state. The BI Dashboard itself shows the currently available source data for the selected period.